Herrenknecht

Schwanau (Germania) - Schlehenweg 2, 77963 Estero, EE
Tel: 0049 (0) 78243020
http://www.herrenkecht.de


Herrenknecht: new drains for...

30/10/2018 In Singapore, a Herrenknecht tunnel boring machine (EPB Shield, Ø 5,250 mm) excavated two large drains for the Stamford Diversion Canal. The challenge: winding bottlenecks and an inner-city drive in one...

Herrenknecht: about-turn for...

06/09/2018 In late July the moment has come: tunnel boring machine "SUSE" (Ø 10,820 mm) has completely excavated the western tube of the Filder Tunnel. Now, in a specially built cavern, the approximately 120...

Herrenknecht: "Käthchen"...

31/07/2018 The site crew working with tunnel boring machine “Käthchen” (“Katie”) has completed the second tube of the Bossler tunnel. The breakthrough near Mühlhausen im Tale in Baden-Württemberg is another...

A future in Schwanau: Spanish...

10/04/2018 To escape the high youth unemployment in their homeland, seven young Spaniards began an apprenticeship as industrial mechanics at Herrenknecht in September 2014. All in all an exemplary success story! Six of...

Herrenknecht: AVN machine builds...

28/02/2018 Where cities grow, the infrastructure has to keep up. In the Black Forest town Freudenstadt, a drainage channel has been created in the new residential area "Sonnenhalde Süd". A Herrenknecht AVN machine...

Herrenknecht hard rock TBM...

03/01/2018 Whether it's a world record with the longest railway tunnel on earth at the Brenner or the epoch-making Gotthard project: the business of mechanized tunnel boring through hard rock is currently reaching new...

New apprenticeship year begins...

25/10/2017 This fall, 56 young men and women began their careers with an apprenticeship at Herrenknecht AG. They are training for occupations such as mechatronics engineers, industrial, structural and machining...

Munich students impress Elon Musk...

25/09/2017 The WARR (German acronym for Scientific Work Group for Rocketry and Space Flight) Hyperloop Team of the Technical University of Munich (TUM) won the SpaceX Hyperloop Pod Competition in Hawthorne, Los Angeles....

Final double breakthrough at the...

11/09/2017 With the breakthrough of the last two tunnel boring machines into the target pit in Oberhausen-Biefang on June 12, 2017 the tunnel and pipe jacking work for the Emscher sewer has been completed. Over a...

Herrenknecht in Los Angeles

25/08/2017 Los Angeles, the city of angels, suffocates in traffic during rush hour. For this reason the Los Angeles Metropolitan Transportation Authority (Metro) is pushing ahead at full speed with the expansion of local...

Herrenknecht TBM in Switzerland ...

24/07/2017 Diameter 13.91 meters, weight 2,000 tonnes, length 75 meters – the Single Shield TBM manufactured at the Herrenknecht plant in Schwanau specifically for construction of the Belchen rehabilitation tunnel...

Exemplary pipeline crossing in a...

12/02/2017 In the fall of 2016, drilling contractor PPI Chrobok S.A. installed two new gas pipelines in Poland. The alignment runs along existing gas lines and through geologically challenging terrain. With the laying of...



Guarda tutte le aziende delle categorie:

Perforazioni e Consolidamento







Contatta Herrenknecht